Photobucket

Willow Oaks Country Club Golf Course Updates

Our goal is to keep the membership informed about projects, agronomic practices, and upcoming events on the golf course.

Photobucket

Navigating this Webpage

Maintenance Calendar, Follow us via Email or Social Media, and ways to find more information

Photobucket

Spring Aeration

Golf Course Closed March 27-31

Photobucket

February Golf Course Update

Winter Projects, Bunker Maintenance, and Greens Aeration Schedule

Photobucket

Air Movement and Fan Video

I took this video to show the efficacy and performance of our new Turf Breeze portable 50" Fan.

Tuesday, February 18, 2020

Amenities and Pre-emergent

The last post highlighted drainage projects our team has completed this winter.  Refurbishing amenities is another winter project that takes many man hours to complete.  Each winter our team will sand and paint each of the tee markers and exit posts.  The benches and divot boxes are coated with oil to protect the wood while creating a richer finish.  All of these amenities will be returned to the course in late March/early April ready for the 2020 golf season.

Benches during oil treatment

Divot Boxes after oil treatment

Freshly painted exit posts

Tee markers after stain and before the ends are painted to identify the tee location

This week we are applying a pre-emergent product for Spring and Summer weeds.  The application should be completed by early next week. 

Most areas are applied by tractor
Walk spreading in wet areas

Friday, February 7, 2020

Course Update and Winter Projects

After a hiatus, the Willow Oaks golf course maintenance blog has returned.  We will be posting information about our current and future projects, course conditions, and other turf information. Follow the blog to avoid missing these updates.

Over the last two days, the course has received 2.2" of rainfall.  The course experienced some bunker wash, standing water, and downed limbs.  We are lucky the projected crest of the James River will not impact the course.  Currently the course is very wet and our team continues to monitor drains and and remove storm debris.  The cleanup process will be our focus for the next several days.

Winter projects keep our team busy.  These projects range from refurbishing the course amenities to installing stone along cart path edges. Upcoming posts will focus on our other winter projects, but for this post I wanted to highlight some projects that will have a direct impact on course conditions and playability.  There are several locations around the course that are in need of drainage, our team is focusing on the ten wettest areas this winter.  Thus far, we have installed drainage in eight of these areas. As you can tell from the pictures below, some projects are smaller in scope, while many grow to a larger scope to properly drain the area. 

Drainage #3 forward tee


Drainage #3 fairway

Drainage #13 approach

Drainage #14 approach


Drainage #14 approach
Drainage #5 approach 
Have a great weekend, I look forward to seeing everyone around the club.

Wednesday, August 9, 2017

Quick August Update

The golf course finally got a reprieve from a hot, dry July with 1.5" of rain overnight Monday.  We were in desperate need and great color is already returning to the bermudagrass surfaces.  July was the 10th hottest on record and despite the heat, greens held up very well and continue to perform at a high level.  Cooler temperatures, shorter days, and projected rain are always a welcome sight.

REMINDER: THE GOLF COURSE IS CLOSED AUGUST 21-25 for putting green aeration.  The greens will be dryjected and a small core will be pulled.  During this closed time, we will also make our first preventative spring dead spot application as well as fertilizer and pre-emergent herbicide applications.  Irrigation is going to be installed to the left of 13 fairway and tees and collars will be aerated.

Our team has been very busy with projects this summer.  All of the tall fescue between #1 tees and the fairway has been replaced with T-10 bermudagrass sod for a more uniform look.  The tree line between 13 and 14 has been renovated, irrigation installed and sprigged for the final piece to the puzzle.  The fescue on 9 and 18 has been replaced with T-10 sprigs and that grow in is going well.  Bunker sand has been added to select bunkers and raking methods have been adapted to provide softer green side bunker conditions and firmer fairway bunkers.  All of this while maintaining a very busy golf course.  Our team has performed at a very high level and are committed to carrying this effort through the busy fall season.  We are excited about the golf course conditioning and the upcoming fall tournaments.


Have a great weekend,

Jordan Booth CGCS
jbooth@willowoakscc.org 


Thursday, July 13, 2017

July Update

This week has brought very high temperatures to our area.  Our team is busy playing defense against heat and drought damage as well readying the course for summer cultural practices next week.  The golf course will be CLOSED next Tuesday, July 18 and Wednesday, July 19 for fairway, tee, and collar aeration and verticutting.   While the golf course is closed, our team will also be converting the fescue areas on 1, 9 and 18 to bermudagrass with sod and sprigs as well as a few other select areas around the course.  The tree line between 13 and 14 will be completed as well as the hill to the right of 15 cart path.

Playing defense and protecting the course from high heat and humidity takes a lot of hard work from the staff as well as sound watering practices.  Fans are on every green and portable fans are in use on holes 10 and 16 while we sort through some electrical issues.  Parts are on the way and the fans on 10 and 16 should be repaired very soon.  Greens are mowed as needed, not daily, during this high temperature and soil moisture is meticulously managed to prevent heat and drought stress or conversely disease and stress from too much water.  Healthy turf is the goal in July and August.  Thank you for your patience while our team waters in the afternoon.

Fairways and tees are in great shape and growing well.  While they are growing this well, it is the perfect time to aerate and verti-cut them to allow for fast recovery.  This allows these surfaces to stay healthy year round.  Sand topdressing will be heavily applied to smooth the surfaces and allow for firm, healthy playing conditions.  Verticutting is the practice of using blades to cut through the top inch or so of the turf and remove thatch.  Similar to aeration, it is more effective on bermudagrass to promote a healthy surface.  The grass can get very puffy and thick this time of year so these practices improve playability as well.  Our team verticut the middle range tee and core aerated the short game practice area and collars on the practice greens this past Monday in preparation for next week.  Now that all of our team and equipment is prepared, it will make next week a lot smoother.  It also gives you an idea of what will be happening on the course.  I have been very pleased with the care of the course and have noticed a lot of filled divots and repaired ball marks.  Thank you!

Our team stays busy this time of year with details such as tree trimming, edging of bunkers, cart paths, and sprinkler heads.  There is a lot to do and detailing the native areas around the water ways is high on our to do list.  The large native areas on 15, 7, and 8 have been cleaned by hand and our team will continue work around the ponds.   Stay cool and hydrated this week and we will see you on the course.

Have a great day,

Jordan Booth, CGCS
jbooth@willowoakscc.org

Here is a picture of Andres core aerating the short game practice area.  This will be the same practice on tees and collars.  Once cleaned up, these areas are topdressed and fertilized.  

Another picture of core aeration. 

The middle range tee was verticut in two directions and heavily topdressed to promote recovery and fill in the practice divots.  This turf is growing aggressively and will be healed over soon.   The fairways will be verticut in one direction.

This is a picture of the heavily divoted area about 100 yards short of the part 5 fifth hole.  50+ divots in this area and 95+% were filled with sand.  Thank you for your care of the course.  


Wednesday, June 28, 2017

June Update

We could not have asked for a better couple of days at the end of June than we experienced this week.   Cool nights and low humidity are always welcome and our schedule greens aeration on Monday could not have come at a better time.  Our team pulled a small 1/4" core and then blew the cores off on Monday.  This is as little disruption as we will ever see from a core aeration but will set the greens up well heading into the summer.  If the weather had been warmer, we would have punted on this aeration but we were able to take advantage of the perfect conditions.  Tees were also deep tine aerated on Monday and both surfaces are recovering well.

Our team has also stayed busy with a few sod projects.  Some of our main goals this year include renovating the roughs on holes 1, 9 and 18 as well as the tree line between 13 and 14.  This month, we sodded the perimeter of the rough on holes 9 and 18 as well as walking paths, sprinkler heads and drains in preparation to sprig this rough to bermudagrass.  This process is much more affordable than sod and allows us to grass large areas at one time.  Most of the fescue on #1 was also sodded out this week.  We chose to sod this instead of sprig due to its location.  The remainder of these rough renovations will take place when the golf course is closed for fairway aeration on July 17-19.  The tree line between 13 and 14 has received a lot of attention this year.  Dead trees were removed and pine straw and mulch beds have been installed.  Our team sodded around these new mulch beds today and last week.  Any remaining fescue will be replaced with sprigs July 17-19.  This project has been a great improvement to the golf course and I look forward to tackling the tree line between 14 and 15 next.

An area that has always been poor is the area directly behind #9 green.  It sits under a large 'namesake' Willow Oak and is the walk on/walk off area for #9 green.  The combination of shade, tree roots, traffic, and compaction has caused the area to be a maintenance nightmare for many years.  This week, we decided to start fresh.  We removed all of the different types of grasses and replaced it with Zeon zoysia.  Zoysia is more shade tolerant that bermudagrass.  We also aerated this area very aggressively and added topsoil to provide the best growing conditions possible, all things considered.  The sod looks great and I am very pleased with the finished product behind 9 green.  We also installed zoysia in the most shaded parts of the tree line on 14, the shaded collar on 7 and the shaded collar on the clubhouse putting green.  Hopefully these are good, long term solutions.  Please avoid walking through the sod until we remove the stakes around it.
The area behind 9 green was stripped and aerated to relieve compaction.  
Topsoil and fertilizer were added.
Finally, our team sodded the areas to Zeon zoysia.  Irrigation heads were leveled to minimize impact to play in this roll off area.
The collar on the clubhouse putting green sits directly under the large Willow Oak in the patio. This picture was taken at 11:30 and this area is in full shade.   Hopefully, zoysia is a good solution.   
The area behind 9 green turned out great and the shade is already creeping on to the zoysia by noon.  
Our primary focus this time of year is plant health and playability.  Fans will be running all summer unless we continue to get 80 degree highs and 55 degree nights (fingers crossed.)  Please do not turn the fans off and if you must, please turn them back on when you leave the green.  The golf course is playing well and should be in peak shape for the extended Independence Day weekend.  

Have a great week,

Jordan Booth, CGCS
jbooth@willowoakscc.org

Wednesday, April 26, 2017

Venting

The golf course has received 3 inches of rain over the last week.  While wet weather is typical this time of year, it still presents challenges.  We have actually fared much better than many courses in the area but the course is very saturated.  All turf surfaces are growing well and the warmer temperatures over the next 7 days will really keep things moving.  Today, our team is venting greens to allow the saturated greens to "breathe",  Venting creates very small holes in the surface that penetrate through the top 3" of the green and allows oxygen in to the roots while helping the greens dry out.  Two appropriate analogies to venting would be: 

1. Opening a window to a stuffy, humid house automatically makes everything inside the house more comfortable
2.  If you put your thumb over the end of a straw, it will never drain.  Remove your thumb and the straw works correctly.  Venting allows an opening at the top of the green so the greens can drain more effectively.  

Our team mows right behind the vent and the holes are barely visible and should not impact putting at all.  The greens are recovering well from the aggressive aeration programs this spring.  We anticipate being 100% healed over by May 1.  Greens are healthy and growing well, it just takes time to rebound from aeration.  The rains and warm weather have the golf course at least a month ahead of schedule.  It looks like July out there and our main attention is now focused on course setup and maintenance.  After all of the rain, our main focus this week will be to get all surfaces mowed and prep for sod installation next week.  On Monday, we will be installing a few more fan poles, repairing the rock wall on 7, and fertilizing the entire golf course.  

Have a great weekend,

Jordan Booth, CGCS
Stephen and Tomas vented greens today ahead of the mowers.  We use the same machine to vent greens that we do to aerate greens, just with a much smaller solid tine and a roller attachment to smooth the surface.  

This greens profile shows the value to deep tine aeration.  The roots on the right are growing down, through a deep tine channel.  Deep, healthy roots lead to firm, healthy greens.


Thursday, April 13, 2017

A Picture Worth Sharing

I thought this picture from Creative Dog Media was worth sending out.  Creative Dog does amazing work and specializes in drone photography with most of their work in and around Richmond.  Here is a link to their twitter feed: https://twitter.com/getcreativedog.  

Greens were rolled this morning and mowed dry this afternoon.  We will mow greens dry whenever possible to avoid picking up too much sand and dulling the mowers.  We will continue to alternate mowing and rolling and encourage a quick recovery from aeration.

Have a great weekend,

Jordan Booth, CGCS
jbooth@willowoakscc.org




Site Search